General Electric Cleveland Bulb Facility
Location
Cleveland, OH
Value
$6.5 Million
This Former bulb manufacturing facility consisted of 16-interconnected buildings totalling 423k-SF of building footprint at multiple floors tall spanning nearly a City block. Subcontractors performed asbestos abatement of materials identified within surveys including additionally discovered asbestos materials not previously visible. Ground crews performed cleaning following asbestos abatement of contamainated surfaces including Mercury and hazardous dust accumulations in areas identified by the client. Crews removed universal and electronic wastes prior to building demolition. Crews demolished building structures removing segregated and sized debris. Slab, foundations and footers were removed under scope. Areas were backfilled with clean fill and leveled to create positive drainage for the site. The site was fully restored.